Batching Plant Operator (2 YEARS)

BATCHING PLANT OPERATOR     (2 YEARS)
  • Responsibilities of BPO
  • General Production Requirements
  • General Concrete Information
  • Department Parameters for Classes of Concrete
  • Maximum Chloride Content Limits for Concrete
  • Initial Plant Approval
  • Normal Operation
  • Expiration of Approval
  • Plant Personnel Requirements
  • Batch Plant Operator
  • Certified Technicians
  • Mix Design Technician
  • Manager of Quality Control
  • Material Information and Requirement
  • Portland Cement
  • Pozzolans and Slag
  • Aggregate
  • Water
  • Admixtures
  • Scales and Meters
  • Water Measuring Devices
  • Admixture Measuring Dispensers
  • Batching Accuracy
  • Required Plant Records
  • Production Criteria
  • Design Mixes
  • Batching Tolerances
  • Batch Adjustments for Material
  • Batch Adjustments for Aggregate Moisture
  • Truck Mixers
  • Central Mixers
  • Cleaning and Maintenance of Mixers
  • Mixing and Delivering Concrete
  • General Requirements
  • Central Mixing
  • Transit Mixing
  • Charging the Mixer
  • Transit Time
  • Delivery Ticket
  • Cold Weather Concreting
  • Hot Weather Concreting
  • Acceptance/Rejection of Delivered Concrete
  • Calculations and examples
Free WordPress Themes, Free Android Games